Articles

Hard Rock Las Vegas Advances Three-Venue Entertainment Complex at Former Mirage Site

Vera Weber · Aug 17, 2026

Hard Rock Las Vegas Advances Three-Venue Entertainment Complex at Former Mirage Site

Artist rendering of the 42-story Guitar Hotel tower rising above the Hard Rock Las Vegas redevelopment site

Clark County filings detail plans for three distinct performance spaces as Hard Rock Las Vegas redevelops the former Mirage property into a resort anchored by a 42-story Guitar Hotel tower, with the entire project targeted to open in late 2027. The venues include a new 2,000-seat West Theater arena, the 5,000-seat Hard Rock Live venue, and a repurposed former Mirage Theater, all positioned to host concerts, residencies, and specialty programming.

Project Scope and Venue Details

Documents submitted to county officials outline how the West Theater will serve as a mid-sized arena built from the ground up, while Hard Rock Live expands an existing footprint into a larger concert hall capable of drawing major touring acts. The former Mirage Theater undergoes conversion rather than new construction, allowing the team to retain portions of the original structure while updating technical systems and seating layouts for modern residencies. Each space receives dedicated production infrastructure, including loading docks, rigging grids, and backstage areas sized for extended runs by headline performers.

County records show the venues sit within the larger Guitar Hotel complex, which rises 42 stories and integrates hotel rooms, gaming floors, and public areas around the performance halls. Planners positioned the theaters so guests can move between the Guitar Hotel lobby and the entertainment zones without crossing exterior walkways, creating a contained resort experience once the property opens in late 2027.

Regulatory Review Process

The Paradise Town Advisory Board and Clark County Commission schedule reviews of the filings submitted in 2026, examining zoning adjustments, traffic impact studies, and building height variances tied to the Guitar Hotel tower. County staff route the plans through standard channels that require public comment periods before final approvals, with the three venues listed as core components of the overall redevelopment application.

Interior concept view of one of the proposed performance venues at the Hard Rock Las Vegas site

Filings indicate the project team coordinates with both advisory bodies on parking allocations and pedestrian pathways that connect the new arenas to the redeveloped Mirage footprint. The review timeline aligns with the late 2027 opening target, allowing construction permits to follow commission votes if the boards clear the current submissions without major revisions.

Programming Focus and Timeline

Plans specify that the three spaces will accommodate a mix of one-off concerts, multi-week residencies, and specialty events such as award shows or branded experiences. The 5,000-seat Hard Rock Live receives the largest capacity designation, while the 2,000-seat West Theater targets more intimate productions, and the repurposed Mirage Theater offers flexibility for both music and non-music formats. County documents note that the venues share back-of-house support facilities, reducing duplication and streamlining operations once the resort begins full programming in late 2027.

Construction sequencing outlined in the filings places venue work on parallel tracks with the Guitar Hotel tower, so interior fit-outs for the performance spaces can begin as soon as structural elements reach completion. The overall schedule keeps the late 2027 opening as the primary milestone, with county reviewers tracking progress through routine inspection checkpoints tied to each phase of the project.

Conclusion

Recent Clark County filings establish a clear path for Hard Rock Las Vegas to deliver three purpose-built entertainment venues alongside the 42-story Guitar Hotel as part of the former Mirage redevelopment, with reviews by the Paradise Town Advisory Board and Clark County Commission now underway. The project maintains its late 2027 target while the three venues take shape to support concerts, residencies, and specialty programming across a range of audience sizes.